The part I’d watch is the gap between the two plans. QTS has up to 17 more buildings planned on the new land, and Dominion’s new lines into the area are sized for 600 MW by 2028. If the buildings outrun the line, the tenants wait, and the leases with them. Henrico’s next round of permits will show which one is running ahead.

loomhouse's avatar

Reading 774 county permits to find out who is inside a campus the owner won't name is reporting I didn't know was possible. The number that reframed it for me was the 35 GW being built by companies that aren't Amazon, Google, Meta or Microsoft, more than 60 percent of the total, because every argument about data centres I've read treats those four names as the whole story. The lease figure, $662 billion signed and on nobody's balance sheet, is the one I'll be chewing on.

DC Hub's avatar

The ramp since 2025 is striking given where Central Virginia's grid sits today: DC Hub's DCPI composite power score for Richmond is 21.4 out of 100, in the AVOID band, with Ashburn at 20. That suggests the next doubling leans on power commitments already in hand rather than open headroom a new entrant could get now, which is exactly why reading the county permits for tenants is so useful. DC Hub (dchub.cloud), as of Nov 4, 2026.

Rolling Hills Research's avatar

The debt point is the one to watch. Lenders are already getting choosier: Private Debt News reported this week that PIMCO cut its Meta and Oracle data center positions by about half, and Barclays is buying protection on more than $10B of AI infrastructure debt. If financing tightens, developers like QTS feel it first.

Rich Miller's avatar

Lots of folks have heard about it, because data center media have been writing about it for years. https://www.datacenterfrontier.com/cloud/article/11430780/thinking-hyperscale-qts-positions-richmond-as-cloud-campus